Ferrite Ring Installation - ALLIANCE CA050L Installation Operation & Maintenance

Tumble dryers 50 pound (25 kilogram) capacity 75 pound (34 kilogram) capacity
Hide thumbs Also See for CA050L:
Table of Contents

Advertisement

Ferrite Ring Installation

Gas and Steam Models with OM and RM Control Suffixes Only (Models Through 7/31/11)
The ferrite ring provided in the literature packet must be installed over the power leads during connection of electrical service. The
ferrite protects the sensitive electronic controls from destructive electrical disturbances which may be present on power lines to the
machine. Failure to properly install the ferrite ring may result in damage to the electronic controls and will void control warranty.
To install:
1. Immediately after connection of power leads and before ap-
plying power to machine, locate each of the incoming service
leads including ground.
2. Snap the ferrite ring closed over all the service leads inside of
the contactor box as shown. It is important that the ferrite ring
©
Copyright, Alliance Laundry Systems LLC -
DO NOT COPY or TRANSMIT
be installed inside the contactor box. Refer to Figure 28 . Do
not install the ferrite outside of the box or other area. Make
sure that service leads are in the center of the ferrite before
closing the ring so as not to pinch or damage leads.
57
Electrical Requirements
Part No. 70457901ENR12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ca050nCk050nCt050lCt050nCu050lCu050n ... Show all

Table of Contents