Installation; Pre-Installation Inspection; Location Requirements - ALLIANCE BA120E Installation Manual

Tumble dryers
Table of Contents

Advertisement

Pre-Installation Inspection

Upon delivery, visually inspect the crate, carton and parts for any
visible shipping damage. If the crate, carton, or cover is damaged
or signs of possible damage are evident, have the carrier note the
condition on the shipping papers before the shipping receipt is
signed, or advise the carrier of the condition as soon as it is dis-
covered.
Remove the crate and protective cover as soon as possible and
check the items listed on the packing list. Advise the carrier of
any damaged or missing articles as soon as possible. A written
claim should be filed with the carrier immediately if articles are
damaged or missing.
IMPORTANT: Remove the yellow shipping wire tie se-
curing the airflow switch.
IMPORTANT: Warranty is void unless tumble dryer is
installed according to instructions in this manual. In-
stallation should comply with minimum specifications
and requirements detailed in this manual and applica-
ble local gas fitting regulations, municipal building co-
des, water supply regulations, electrical wiring regula-
tions, and any other relevant statutory regulations. Due
to varied requirements, applicable local codes should
be thoroughly understood and all pre-installation work
arranged for accordingly.
Materials Required (Obtain Locally)
All Models
Circuit breaker on 3 Phase models.
©
Copyright, Alliance Laundry Systems LLC -
DO NOT COPY or TRANSMIT

Installation

Materials Required (Obtain Locally)
Steam Models
IMPORTANT: 3 Phase Only – Each tumble dryer must
be connected to its own individual branch circuit
breaker, not fuses, to avoid the possibility of "single
phasing" and causing premature failure of the mo-
tor(s).

Location Requirements

The tumble dryer must be installed on a level floor. Floor cover-
ing materials such as carpeting or tile should be removed.
To assure compliance, consult local building code requirements.
The tumble dryer must not be installed or stored in area where it
will be exposed to water and/or weather.
Table continues...
IMPORTANT: DO NOT block the airflow at the rear of
the tumble dryer with laundry or other articles. Doing
so would prevent adequate air supply to the combus-
tion chamber of the tumble dryer.
A typical tumble dryer enclosure is shown in Figure 2 .
IMPORTANT: Install tumble dryers with sufficient clear-
ance for servicing and operation, refer to Figure 2 .
IMPORTANT: The dryer must not be installed behind a
lockable door, a sliding door or a door with a hinge on
the opposite side to that of the tumble dryer, in such a
way that a full opening of the tumble dryer door is re-
stricted.
23
One steam shut-off valve for steam service
line to be connected upstream of solenoid
steam valve.
Two steam shut-off valves for each conden-
sate return line.
Flexible steam hoses with a 125 psig
[pounds per square inch gauge] [862 kPa]
working pressure for connecting steam
coils. Refer to Figure 16 and Figure 17 for
sizing and connection configurations.
Two steam traps for steam coil outlets to
condensate return line.
Optional – Two vacuum breakers for con-
densate return lines.
Part No. 70532501ENR7
Installation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ga120eHa120nHu120lPk120nNk120nSj120e ... Show all

Table of Contents