HRM
2ilo:g
HRM
3 .. 4.3 •
Initial Chec:kout and St,artup
Procedure:
This
pro-
cedure
assumes
that
drive
cabling and configuration pro-
cedures of this section have been performed and
sati~fied.
(1)
Remove the front panel from the Disk/Tape Module.
(~~)
Place the rotary-arm shipping lock to the OPERATE posi-
tion.
Refer to Figure
3-9
for drive-to-system orienta-
tion.
CAUTION
Figure
3-9
shows the rotary-arm shipping
lock
in
the
locked
and
operating positions.
To prevent
damage to the read/write heads or the disk itself,
place
the rotary-arm shipping lock in the OPERATE
position only after
installation
has
been
com-
pleted.
-----l.~;dJ~--------Ll:::::::==:t..J---
FRONT OF
SYSTEM
ROTARY·ARM
SHIPPING LOCK
00405
Figure
3-9
Rotary-Arm Shipping Lock Orientation
3-17
2ilog
3-17
Need help?
Do you have a question about the System 8000 and is the answer not in the manual?
Questions and answers