Ventilation and heat sources
Router operating position
Chapter 3 • Installing the satellite router
22
1039456-0001 Revision A
Make sure the installation location meets the following requirements concerning
ventilation and heat sources.
NOTICE
• Do not block any of the router's ventilation openings.
• Leave 6 inches of space around the top and sides of the router to ensure
adequate ventilation and prevent overheating.
• Do not place the router near a heat source such as direct sunlight, a
radiator, heat register or vent, oven, stove, amplifier, or other apparatus
that produces heat.
NOTICE
Install and operate the HX90 router only in the upright vertical position as
shown in Figure 4. Any other position could result in insufficient ventilation,
overheating, and malfunction.
Figure 4: HX90 in vertical position