Items required for installation

Chapter 2 • Preparing for installation
14
1039456-0001 Revision A
Check neutral-ground (N-G) voltage
With a digital multimeter set to AC voltage, measure the voltage
between neutral and ground at the AC power outlet. If the N-G voltage
measures 2 VAC or greater, please advise the customer to have an
electrician evaluate the electrical power outlet. N-G voltages may have a
negative impact on the performance of electronic equipment.
Grounding (router, antenna, radio, and IFL)
Adhere to Hughes grounding requirements.
Use only approved ground wires, ground blocks, lugs, and clamps.
For detailed information refer to the appropriate FSB, as listed in Table 3 on page 20.
To install the HX90 satellite router, you need:
• HX90 satellite router
• Power supply (provided in the shipping carton)
• Surge protector (recommended), provided by the customer
• Cat-5 Ethernet cable
file (if you are instructed to upload it)
sbc.cfg
• Installation Reference Sheet and installation specification (provided to the
installer)
Notes
sbc.cfg file — If needed, you can download the most current
installation support web site.
SAN and PIN or site ID — Identification numbers are required to register the satellite
router. Customers who purchased their system from a Hughes retail channel in the
United States or Canada receive an order confirmation e-mail containing their site
account number (SAN) and personal identification number (PIN). For enterprise
customers or customers outside the United States and Canada, you need a site ID to
register the router.
DC/DC power supply — If the site has a DC power source, it requires a DC/DC power
supply. See Table 2 on page 17. The installer must provide the wire required to
assemble the DC input power cable.
file from your
sbc.cfg