▼ Install the Server
Caution – A fully configured server weighs 175 lbs (80 kg). Use a mechanical lift to
install the server into the rack.
1. Ensure the mechanical lift is level and stable.
2. Lift the server up to the correct height.
3. Slide the server into the rack.
Ensure that the bottom edge of the server has cleared the bottom of the rack rails.