▼ Power On the System for the First
Time
Complete the following tasks:
Confirm that you have completed the installation of the server in its rack. See
■
"Installing the Server" on page
Attach the cable management assembly. See
■
Connect a terminal or terminal emulator to the SER MGT port. See
■
Terminal or Emulator to the SER MGT Port" on page
1. (Optional) Connect an Ethernet cable between the server's NET MGT port and
the network to which future connections to the SP and host will be made. See
"Connect the NET MGT Cable" on page
After the initial configuration of the server using the SER MGT port,
communication with the SP and host is usually performed through this Ethernet
interface.
2. Connect an Ethernet cable between one of the server's NET ports
Components" on page
3. Plug the power cords into the power supplies and into a power source.
Note – Only two power connections are required for operation. Use four power
connections and two separate circuits for redundancy.
The service processor runs on the 3.3V standby voltage. As soon as AC power is
connected to the server, the service processor powers on, runs diagnostics, and
initializes the ILOM firmware.
After a few minutes, the SP login prompt appears on the terminal device. The host
is not initialized or powered on yet.
4. At the terminal device, log in to the SP as root with a password of changeme.
XXXXXXXXXXXXXXXX login: root
Password: changeme
. . .
->
After a brief delay, the Oracle ILOM prompt is displayed (->).
15.
41.
4) and the network to which the server will communicate.
Powering On the Server for the First Time
"Install the CMA" on page
46.
32.
"Connect a
("Rear Panel
47
Need help?
Do you have a question about the SPARC T4-4 and is the answer not in the manual?