▼ Determine Correct Rackmount
Hardware
Use the following table to determine the hardware needed for your rack
installation.
Cabinet Type
Square hole
Round hole (10-32) with corner bezel
Round hole (M6) with corner bezel
Round hole (10-32) inside installation
Round hole (M6) inside installation
Note – Some of the fastener bags that are included in the kit are not required to
install this server.

▼ Mark the Rackmounting Location

Use the rackmounting template to identify the correct mounting holes for the shelf
rails.
Note – Load the rack from bottom to top.
Fastener Bags Required
SCREW, SEMS, M6 X 16
CAGENUTS, M6
SCREW, FLAT HEAD, M4 X 10
SCREW, SEMS, 10-32 X 10
SCREW, FLAT HEAD, M4 X 10
SCREW, SEMS, M6 X 12
SCREW, FLAT HEAD, M4 X 10
SCREW, SHOULDER, 10-32
SCREW, FLAT HEAD, M4 X 10
SCREW, SEMS, M6 X 12
SCREW, FLAT HEAD, M4 X 10
Installing the Server
19

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SPARC T4-4 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents