Glove Box Components; Glove Box Hinge, Bin, Inner Door And Latch Removal; Glove Box Outer Door Removal; Glove Box Lock Cylinder Removal - Jeep 200 Cherokee Service Manual

Table of Contents

Advertisement

XJ
REMOVAL AND INSTALLATION (Continued)
Fig. 17 Glove Box Remove/Install
1 – GLOVE BOX
2 – LATCH
3 – SCREWS
(4) Reconnect the battery negative cable.

GLOVE BOX COMPONENTS

The glove box hinge, bin, inner door and latch are
serviced only as a complete unit. The glove box outer
door and lock cylinder are serviced separately.
WARNING: ON VEHICLES EQUIPPED WITH AIR-
BAGS,
REFER
TO
RESTRAINT SYSTEMS BEFORE ATTEMPTING ANY
STEERING
WHEEL,
INSTRUMENT PANEL COMPONENT DIAGNOSIS OR
SERVICE. FAILURE TO TAKE THE PROPER PRE-
CAUTIONS COULD RESULT IN ACCIDENTAL AIR-
BAG DEPLOYMENT AND POSSIBLE PERSONAL
INJURY.
REMOVAL
GLOVE BOX HINGE, BIN, INNER DOOR AND LATCH
(1) Disconnect and isolate the battery negative
cable.
(2) Remove the glove box from the instrument
panel. Refer to Glove Box - Removal in the
Removal and Installation section of this group for the
procedures.
(3) Remove the seven screws that secure the inner
glove box door to the outer glove box door (Fig. 18).
(4) Remove the inner glove box door unit from the
outer glove box door.
GLOVE BOX OUTER DOOR
(1) Disconnect and isolate the battery negative
cable.
(2) Remove the glove box from the instrument
panel. Refer to Glove Box - Removal in the
GROUP
8M
-
PASSIVE
STEERING
COLUMN,
INSTRUMENT PANEL SYSTEMS
Fig. 18 Glove Box Components Remove/Install
1 – OUTER DOOR
2 – STOPS
3 – INNER DOOR
4 – LATCH
5 – BIN
6 – HINGE
7 – SCREWS
Removal and Installation section of this group for the
OR
procedures.
(3) Remove the seven screws that secure the inner
glove box door to the outer glove box door (Fig. 18).
(4) Remove the outer glove box door from the inner
glove box door unit.
GLOVE BOX LOCK CYLINDER
(1) Insert the key into the glove box lock cylinder
and turn the lock cylinder to the unlocked position.
(2) Open the glove box.
(3) With the key still in the lock cylinder, insert a
small pin punch or a stiff wire into the lock cylinder
release hole (Fig. 19) and depress the lock cylinder
retaining tumbler.
(4) While holding the retaining tumbler depressed,
rotate the key in the lock cylinder clockwise and
press outward on the back of the lock cylinder from
the inside of the glove box door until the lock cylin-
der comes out of the glove box latch lock cylinder
bore.
INSTALLATION
GLOVE BOX HINGE, BIN, INNER DOOR AND LATCH
(1) Position the inner glove box door unit onto the
outer glove box door.
8E - 23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2000 cherokee 4x42000 cherokee 4x22000 cherokee

Table of Contents