Maintenance Processes - Neopost in-600 Series User Manual

Mailing system with imeter postage meter
Hide thumbs Also See for in-600 Series:
Table of Contents

Advertisement

10.4

Maintenance Processes

Maintenance process details
The maintenance processes listed below are only to be completed on request from by
Customer Service.
Check that your Mailing System is connected to a telephone line or the LAN before starting.
As supervisor (see
How to Log in as Supervisor
Press
and type 7.4 or select the path:
Maintenance
1.
Installation Process
- First time installation of your system.
2.
Remove the Base
- Remove the base from service.
- Prepares the base for removal by saving data on USB key.
3.
Swap base
- Install a replacement base.
4.
Withdraw the PSD
- Remove PSD from service.
- Requires a password from Customer Services to perform.
5.
Swap the PSD
- Allows installation of a new PSD in mail system. Old PSD must have already
been withdrawn.
6.
Update Registration
- This procedure is used if you have changed your address.
- Contact your Customer Service to change your information then you will be
instructed to perform the update registration procedure.
Processes
on page 154):
10
221

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents