Maintenance Processes - Neopost IS-430 User Manual

Mailing machine
Hide thumbs Also See for IS-430:
Table of Contents

Advertisement

Maintenance Processes

10.3 Maintenance Processes

The maintenance processes listed below are only to be completed on request from
by Customer Service.
Check that your Mailing System is connected to a telephone line or the LAN before
starting.
As supervisor (see
Press
> Maintenance > Processes
1 Installation Process
First time installation of your system.
2 Remove the Base
Remove the base from service.
Prepares the base for removal by saving data on USB key.
3 Swap base
Install a replacement base.
4 Withdraw the PSD
10
Remove PSD from service.
Requires a password from Customer Services to perform.
5 Swap the PSD
Allows installation of a new PSD in mail system. Old PSD must have already
been withdrawn.
6 Update Registration
This procedure is used if you have changed your address.
Contact your Customer Service to change your information then you will be in-
structed to perform the update registration procedure.
180
How to Log in as Supervisor
and type
7.4
or select the path:
p.128 ):

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Is-4204135502p

Table of Contents