Maintenance Processes - Neopost IS-330 User Manual

Mailing systems with imeter postage meter
Hide thumbs Also See for IS-330:
Table of Contents

Advertisement

10.4

Maintenance Processes

The maintenance processes listed below are only to be completed on request from by
Customer Service.
Check that your Mailing System is connected to a telephone line or the LAN before starting.
As supervisor (see
Press
Maintenance
Processes list
10
1.
Installation Process
- First time installation of your system.
2.
Remove the Base
- Remove the base from service.
- Prepares the base for removal by saving data on USB key.
3.
Swap base
- Install a replacement base.
4.
Withdraw the PSD
- Remove PSD from service.
- Requires a password from Customer Services to perform.
5.
Swap the PSD
- Allows installation of a new PSD in mail system. Old PSD must have already
been withdrawn.
6.
Update Registration
- This procedure is used if you have changed your address.
- Contact your Customer Service to change your information then you will be
instructed to perform the update registration procedure.
190

Maintenance Processes

How to Log in as Supervisor
and type 7.4 or select the path:
Processes
on page 126 ):

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Is-350

Table of Contents