Download a parameter set with a BOP
Prerequisites
● Supply voltage is active for the download inverter
● The download inverter is in "Ready to Run".
Parameter
Description
Fit the BOP to the inverter and perform the download according the flow chart.
P0003 = 3
User access level*
1: Standard: Allows access to the most frequently used parameters (default)
2: Extended: Allows extended access e.g. to inverter I/O functions
3: Expert: For expert use only
P0010 = 30
Commissioning parameter*
0: Ready (default)1: Quick commissioning
2: Inverter
30: Factory setting, parameter transfer
95: Safety commissioning (for CUs with fail-safe functions only)
P0803 = 1
Transfer data to EEPROM
0: Disabled (default)
1: Start BOP transfer
2: Start MMC Transfer
While the download is active "bUSY" will be displayed on the BOP and the inverter will not
react to any commands.
If the download has been completed successfully, P0010 and P0803 will be set to 0 and the
BOP display will return to normal.
If the download has failed, F00051 (failure while accessing EEPROM), F00055 (failure while
saving parameter to EEPROM), F00057 (BOP fault) or F00058 (BOP contents incompatible)
will be displayed.
In this case attempt another download, perform a factory reset to allow the inverter to return
to a known state or perform a power-cycle to confirm F00051.
After a successful download the BOP can be removed and connected to another inverter for
download. Then perform the download steps again until the series commissioning has been
completed for all inverters.
Control Units CU240S
Operating Instructions, 07/2008 - FW 3.2, A5E00766042B AD
Commissioning
5.5 Commissioning using the BOP
Setting