Connection Planning

Use this checklist to help you plan the incorporation of your single controller SnapSAN
S1000 into your SAN network. For a dual-controller system (shown in square brackets),
double the number of connections:

Installation Overview

WARNING:
and align the unit to prevent injury during installation. Use care when inserting or removing a
unit into or out of a rack to prevent the accidental tipping of the rack causing damage or personal
injury.
AVERTISSEMENT:
soit utilisé pour élever et d'unifier l'appareil pour éviter des blessures pendant l'installation.
Faites attention lorsque vous insérer ou de retirer une unité d'entrée ou de sortie d'un support pour
empêcher le déversement accidentel de la crémaillère causant des dommages ou des blessures.
CAUTION:
environment with power conditioning and an adequately rated uninterruptible power supply
(UPS). The unit is intended to be grounded.
IMPORTANT: Before unpacking the unit, ensure that the area is free from conditions that
cause electrostatic discharge (ESD). Discharge static electricity from your body by touching a
known grounded surface. Also, avoid touching pins, leads, or circuitry.
10400310-003 01/2013
Type
IP Address
GbE Switch
Host:
Fibre Channel
1Gb iSCSI
10Gb iSCSI
SAS Direct
SAS Switched
It is recommended that a mechanical lifter (or at least two people) be used to raise
il est recommandé que la mécanique lifter (ou au moins deux personnes)
Overland strongly recommends that you install the unit in a clean, air-conditioned
©2010-13 Overland Storage, Inc.
Connection
DHCP (default) or Static
One [or two] RJ45
Two [or four] 4Gbs (SFP) on a Fibre switch
Four [or eight] 1Gbs (RJ45) on a 1Gb Ethernet switch
Two [or four] 10Gbs (SFP+) on a 10Gb Ethernet switch
One [or two] 6Gbs (or 3Gbs) SAS (SFF-8088) available on
each host. Two [or four] for connections with redundancy.
Maximum of four [or eight] hosts with dual controllers
without redundancy or two [or four] with redundancy.
Two [or four] 6Gbs (or 3Gbs) SAS (SFF-8088) available on
SAS switch to desired hosts
Connection Planning
2-2