Stop Running The Mpu Patch; Establishing The Configuration Task; Deactivating The Mpu Patch - Huawei V300R005 Configuration Manual

Quidway netengine80 core router
Hide thumbs Also See for V300R005:
Table of Contents

Advertisement

Quidway NetEngine80
Configuration Guide - Basic Configurations
Step 3 Run:
patch run slave
The slave MPU patch is run.
----End
A patch can be run only after it is activated. Running a patch means that the patch is activated
permanently and the patch remains valid after the board is reset.

12.5 Stop Running the MPU Patch

12.5.1 Establishing the Configuration Task

Applicable Environment
After a patch is activated, you need to judge that the patch has achieved the expected effect. If
the patch does not become valid, you need to activate the patch.
A patch can be deactivated only after it is activated.
Pre-configuration Tasks
None.
Data Preparation
None.
Configuration Procedures
No.
1

12.5.2 Deactivating the MPU Patch

Do as follows on the router to be upgraded.
Step 1 Run:
system-view
The system view is displayed.
Step 2 Run:
patch deactive
The MPU patch is deactivated.
Step 3 Run:
Issue 04 (2009-12-20)
Procedure
Deactivating the MPU Patch
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
12 Patch Management
12-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Quidway netengine80

Table of Contents