ITS Power over Ethernet Unit Test and Inspection Procedures

Table 5-7 lists which tests you must perform when performing service events on
IntelliVue Telemetry System PoE Unit.
Installation
Preventive Maintenance
Any component repair or replacement
Hardware Upgrade
Software Upgrade
All other Service Events
Test Block
Name
PoE Unit Visual
PoE Unit
Power On
PoE Unit
Performance
PoE Unit
Revision Check
Sync Unit
Safety
IntelliVue Telemetry System Infrastructure Installation and Service Guide
ITS Power over Ethernet Unit Test and Inspection Procedures
Table 5-7: ITS PoE Unit Test and Inspection Requirements
When Performing this
Service Event...
Table 5-8: ITS PoE Unit Test and Inspection Matrix
Test or Inspection to Perform
Inspect all system components for
obvious damage. Visually inspect all
system components, cables, and
connectors. Check for signs of abrasion,
wear, or other damage.
With power connected to each active
Network device, observe that all lights
visible on the front panel are in proper
status and that no error conditions are
shown.
Verify that the AC LED on front panel is
solid GREEN. Verify that the Link LED is
lit GREEN for each connected cable.
No performance check is required.
No revision check is required.
No safety test is required
Complete These Required Test(s)
Visual, Power On
N/A
Power On
N/A
N/A
Visual, Power On
Expected Results
No visible damage
Devices power up
into expected
status; no error
indications are
shown.
Information to
Record on
Service Record
V:P or V:F
where:
P = Pass
F = Fail
PO:P or PO:F
where:
P = Pass
F = Fail
P:NA
where:
NA=Not
Applicable
RC:NA
where:
NA=Not
Applicable
S:NA
where:
NA=Not
Applicable
5-5