Expansion Test - Toshiba Portege M200 Maintenance Manual

Hide thumbs Also See for Portege M200:
Table of Contents

Advertisement

3 Tests and Diagnostics

3.14 Expansion Test

To execute the expansion test, select 11-EXPANSION TEST from the DIAGNOSTICS TEST
MENU, press Enter and follow the directions on the screen. The expansion test contains two
subtests.
NOTE: To execute this subtest, the PC card wraparound connector is required.
Subtest 01
PCMCIA Wraparound
This test checks the following signal line of the PC card slot:
q Address line
q REG#, CE#1, CE#2 line
q Data line
q Speaker line
q Wait line
q BSY#, BVD1 line
This subtest is executed in the following order:
Sub#
Address
01
00001
00001
02
00002
03
00003
04
00004
05
00005
NOTE: When selecting the subtest number 01, the following message will appear. Specify
the slot you want to use.
Test slot number select (1:slot0, 2:slot1, 0:slot0&1)?
3-34
Good
Bad
nn
xx
Address line
nn
xx
REG#, CE#1, CE#2
ww
rr
Data line
––
––
Speaker line
40,80
xx
Wait line (40<xx<80)
nn
xx
Other lines (BSY#, BVD1)
Portege M200 Maintenance Manual (960-457)
3.14 Expansion Test
Contents
nn=A0, 90, 80, 00
ww=write data, rr=read data
NN=21, 00

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents