Toshiba Portege M200 Maintenance Manual page 132

Hide thumbs Also See for Portege M200:
Table of Contents

Advertisement

3 Tests and Diagnostics
Subtest 03
Real time carry
CAUTION: When this subtest is executed, the current date and time are erased.
This subtest checks the real time clock increments. Make sure the date and time are
displayed in the following format and they move forward correctly.
Current date : 12-31-1999
Current time : 23:59:58
PRESS [Enter] KEY TO EXIT TEST
Press Enter to exit.
3-32
3.12 Real Timer Test
Portege M200 Maintenance Manual (960-457)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents