CHAPTER 2 Preparing for Main Unit Installation

2.5 Checking the Installation Site

2.4.2 Facility power requirements and characteristics

To obtain the required degree of redundancy, the facility must have two independent supplies of power. Connect the circuit
breakers to the power receiver provided by the electric power company or to a UPS (uninterruptible power supply).
If the main unit operates in an environment that experiences frequent power failures or has a power source that often
becomes unstable, the component failure rate tends to rise.
The PRIMEQUEST2000 series supports the following power feed:
-
redundant power feed
-
dual power feed
For details on the power line configurations for redundant power connections and dual power connections, see 2.3 Power
Cable Connections in the PRIMEQUEST2000 Series Hardware Installation Manual (CA92344-0535).

2.4.3 Grounding

The PRIMEQUEST2000 series is shipped with grounded (three-wire) power cables. You need to connect the power
cables to outlets with ground terminals. To determine the type of power supply in your building, contact the building
manager or a qualified electrician.
2.5
Checking the Installation Site
Before installing the main unit, confirm that the installation site has enough space for the required service
(maintenance) area and for accommodating the peripheral devices. For details on checks of the installation site, see
Chapter 1 Installation Information in the PRIMEQUEST2000 Series Hardware Installation Manual (CA92344-0535).
2.6

Preparing to Install the Main Unit

TABLE 2.1 Accessories required in main unit installation lists the accessories required in main unit installation. Prepare
these accessories in advance.
Accessory name
No. 2 Phillips screwdriver
Wrist strap
Conductive mat
Ethernet Category 5 cable or better
Console PC-to-LAN cable (for user LAN)
External switching hub
Multitester

TABLE 2.1 Accessories required in main unit installation

Description
Used to mount the unit in a rack.
Used to prevent main unit damage from static electricity
discharged from your body.
Required for some system configurations. To order any of
the accessories, contact the distributor where you
purchased your product, or your sales representative.
Used to connect the PRIMEQUEST2000 series server to
an external switching hub via a LAN.
Used to check the input AC voltage.
5