Commissioning Checklist; Installer Details - Rinnai Advance Operation And Installation Manual

Flame fire
Table of Contents

Advertisement

Commissioning Checklist

Complete the installation and commissioning checklist below and make sure this manual is left with the
customer. Explain to the customer about the use and care of the unit and understands the instructions
and operation of the appliance.
If operating without a dress guard please follow safety instructions to prevent the risk of injury from
burns. young children and the infirm should be supervised at all times.
1.
Appliance positioned in suitable location?
(i.e. clearances, combustibles etc.)
2.
Was a Rinnai approved flue system installed and is the flue
drawing effectively
3. Has specified gas pressures been checked and set?
4
Is the logset located correctly?
5. Have the granules been placed evenly on top of the burner,
free of dust and powder?
6. Has the appliance been test fired for correct operation?
7. Is the end-user fully aware of operating procedure?

Installer details

Company name:______________________________________________________________
Installers name:______________________________________________________________
Address:____________________________________________________________________
________________________________________________________________________________
Phone: ________________________________ Mobile:___________________________________
Permit number for installation:___________________________________________________
Signed: _______________________________ date:________________________________
Rinnai New Zealand
30
NO
yES
Reflection: 03-08

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents