Rinnai Advance Operation And Installation Manual page 26

Flame fire
Table of Contents

Advertisement

Installation Procedure
Logset Installation
The logset assembly is made up of a main, top and right log (assembled as 1 piece) with 2
holes underneath for location onto the pins and inside the heater.
Remove Log
Carefully remove log packaging and place
Packing and
the logset onto the heater ensuring that the
Place Logset
locating pins enter the two locating holes of
the logset.
Place Granules
Gently place loose ember bed material
in front of the main log. Level it with a
pencil or screwdriver and remove excess
material.
do not pour granules as dust particles
from plastic bag may block the burner
ports. The granules must be placed after
the logset is fitted. If the logset is to be
removed for any reason the granules must
be removed first.
Any material that prevents the logs sitting flat on the burner top can upset
the burning pattern and performance of the heater.
Replace Glass and Condition Logset
Replace and fit glass so that the join/gap in the glass seal is at the bottom. Take care not to
damage the seals.
When first lighting the heater, the logs need burning in. This can take approximately 2 hours
for the logs to achieve their full flame pattern and glow.
during the initial burning in period, some smoke and smell may be experienced. The heater
should be run on the high setting in a well ventilated room until these dissipate.
Rinnai New Zealand
26
Reflection: 03-08

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents