AGA Gas Installation Code AG601 - NZ 5261. • Any other relevant statutory regulation. • Rinnai strongly recommend that this product be installed with an • approved flue system for optimum product performance. This appliance must only be installed, serviced and removed by an •...
5. Under no circumstances must combustible materials be present on the inside of the fireplace recess or flueway. Note: A Rinnai Zero Clearance kit is available where the heater is required to be installed in close proximity to combustible framing.
There must be no leakage of smoke through the structure of the chimney during or after the test. Inside, upstairs and/or adjacent rooms should also be checked. If any of the above criteria is not met, a Rinnai approved flue liner system must be installed.
FLUEING CHECK DIMENSIONS OF FIREPLACE • Check dimensions of fireplace and if necessary bring them to dimensions shown. Note: Brackets are supplied to retain the heater to the fireplace and must be attached prior to installation as shown in the diagram. CHECK FLUEWAY •...
GAS CONNECTION RUN GAS SUPPLY • For pipe sizing, refer to your local gas installation codes. Copper supply should be run leaving the end of the pipe in a suitable position to be able to attach to the stainless steel flexi- tube and the 1/2”...
LOG INSTALLATION he logset is packed inside the heater and the packaging must be removed prior to installing the logset in its correct position. • Open both side panels. • Remove fastenings on both sides of the top glass retainer. Lift retainer away from heater.
INSTRUCT CUSTOMER ON USE OF UNIT • Explain to customer about use and care of unit. Make sure the customer understands the instructions. EXPLAIN • Ignition, Adjusting heat level, Fan Switch, Turning “OFF”. NOTE: RINNAI RESERVES THE RIGHT TO CHANGE OR MODIFY SPECIFICATIONS WITHOUT NOTICE.
FGL30 IDBN (NG) Australia FGL30 IDBL (Propane) Australia IB35RN (NG) New Zealand IB35RL (Propane) New Zealand Description: Rinnai Inbuilt Radiant/Convector, glass-fronted, ceramic log space heater with forced convection and natural draught flue system. Input: 33 MJ/h Natural Gas and Propane. Gas Control: Rinnai Push-Button Combination Control.
INSTALLATION / COMMISSIONING CHECKLIST (To be completed by certified Gas Installer) ____________________ Model: 1. Was a fireplace inspection carried out? (ie. clearances, combustibles etc.) 2. Was chimney inspected? 3. Did chimney require flue liner system to be installed? If NO, did chimney meet specified criteria as per manual? 4.