INSTALLATION / COMMISSIONING CHECKLIST

(To be completed by certified Gas Installer)
Model: _______________________________
1. Was a fireplace inspection carried out?
(i.e. clearances, combustibles etc).
2. Was a Rinnai flue system installed in accordance with the instructions?
3. Have specified gas pressures been checked and set?
4. Are decorative logs located correctly?
5. Have ember granules been placed and free of dust and powder?
6. Has the appliance been test fired for correct operation?
(All Burners light without delay)
7. Is the end-user fully aware of operating procedure?
8.
Is the hearth surface flat and level to support the entire heater or
zero clearance box?
INSTALLERS / GAS FITTER DETAILS
Company name
:
Installers name:
Address:
Phone:
Certificate of Compliance / Certification Number
(* where applicable)
Authorised Persons – Licence Number: _______________________________
Signed
:________________________
Inbuilt Royale - ETR
____________________________________________________
____________________________________________________
____________________________________________________
____________________________________________________
____________________________________________________
__________________
Mobile:
__________________________
:__________________________
Date:___________________
- 27 -
NO
YES
Issue 4- ©Rinnai