Service Schedule - Husqvarna Rider ProFlex 21 II Workshop Manual

Hide thumbs Also See for Rider ProFlex 21 II:
Table of Contents

Advertisement

For Husqvarna Parts Call 606-678-9623 or 606-561-4983
DELIVERY AND DEALER SERVICE

Service Schedule

The following is a list of maintenance procedures that must be performed on the rider. Most of the points
that are not described in this workshop manual are found in the operator's manual.
= Described in this workshop manual.
= Not described in this workshop manual or the operator's manual.
= Described in the operator's manual.
Maintenance
Check for fuel and oil leaks
Check the parking brake
Check the engine oil level
Check the fuel pump's air filter.
Check the safety switch, seat
Check the safety switch, lifting
lever
Check the safety switch, pedal
system
Check/clean the engine's
cooling air intake
Check the cutting unit:
• Attaching the blades
• Condition of the blades
(sharpness, shape, etc.)
Check the steering cables
(any play, etc.)
Check fastenings (screws,
nuts, etc.)
Start the engine and blades,
listen for unusual sounds
Clean under the cutting unit
Clean the transmission's
cooling air intake
Check the battery's acid level
Check the transmission oil level
Check the condition of V-belts,
belt pulleys, etc.
Check for damage
Check the air pressure in the
tyres (60 kPa/8.5 PSI)
Check to ensure that the cable
seats in the middle are
undamaged
10
English-
Page
Daily
mainte-
mainte-
nance
before
-
37
16
-
75
75
75
-
62
68
70
34
-
-
-
-
15
17
-
-
17
-
www.mymowerparts.com
Daily
At
Weekly
least
3)
main-
nance
once
tenance
after
a year
Maintenance interval
in hours
25
50
100
300

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents