Maintenance Schedule For The Service Center - Husqvarna R 214C Workshop Manual

Hide thumbs Also See for R 214C:
Table of Contents

Advertisement

6 Maintenance schedule for the service center

1. PREPARE THE PRODUCT
Do a check of the battery.
Do a check of the blades.
Do a check of the belts and pulleys.
Do a check of the steering chain of the inner side of the frame tunnel.
Do an inspection, lubricate and adjust all wires.
Make sure that all screws and nuts are tightened with the correct torque.
Lubricate the operators seat.
Lubricate the wheels and blade bearings on the cutting deck.
Lubricate the pedals on the inner side of the frame tunnel.
Lubricate the belt tensioner.
2. ENGINE
Do a check of the fuel hose. Replace if it is necessary.
Replace the fuel filter.
Replace the prefilter and paper filter in the air filter.
Clean the engine and the hydrostatic transmission.
Do an inspection of the cooling fins on the hydrostatic transmission.
Do a check of the muffler and the heat deflector.
Replace the engine oil. Refer to
Replace the engine oil filter.
Replace the spark plug.
Do a check of the battery and charge if it is necessary.
3. TRANSMISSION, CONTROLS AND DRIVE SYSTEM
Do a check of the oil in the transmission and fill if it is necessary. Refer to
a check of the transmission oil level on page 11 .
Make sure that the tire pressure is correct. Refer to
Examine and adjust the parking brake.
Replace the oil in the transmission. Refer to
on page 37 .
14 - Maintenance schedule for the
service center
Technical data on page 49 .
Wheels on page 9 .
To replace the oil in the transmission
First serv-
Maintenance interval
icing
in hours
50
O
O
First serv-
Maintenance interval
icing
in hours
50
Clean
O
O
O
O
First serv-
Maintenance interval
icing
in hours
50
To do
O
O
O
1592 - 002 - 11.02.2021
100
200
O
O
O
O
O
O
O
O
O
O
100
200
O
O
O
O
O
O
O
O
O
O
100
200
O
O
O
O

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents