Starting the Inverter

Starting up the GT Inverter

Commissioning Multiple Inverters

4–4
http://www.wholesalesolar.com/inverters.html
To start up the inverter:
1. Switch the DC/AC Disconnect switch to the ON position (see Figure 4-1).
2. Check the GT Inverter LCD. The startup screens (see Table 5-1 on page 5–3)
should appear for five seconds each, and then the "Reconnecting in sss
seconds" special screen (see Table 5-10 on page 5–9) will appear until the 305
second (default value) protection timer countdown is completed.
DC/AC Disconnect Switch

Figure 4-1 DC/AC Disconnect Switch Positions

In an installation with multiple GT Inverters, special commissioning procedures
must be followed in order to safely determine if any DC wiring problems exist.
Important:
Before performing this procedure, all inverters should be off, with the
DC/AC disconnect switch in the OFF position.
To commission multiple inverters:
1. Uncover the PV arrays and/or close the main DC disconnect switch, if one is
installed.
2. Start the first inverter by turning the DC/AC disconnect switch to the ON
position.
3. Wait for the input current to rise above 1 A.
This information is displayed on the Array Readings screen. To display the
Array Readings screen, tap the unit four times.
http://www.wholesalesolar.com/inverters.html
975-0245-01-01