To mount the unit using poles:
1. Ensure that poles or rails are securely assembled in place. If using horizontal
rails, three rails are required: two for the mounting bracket and a third for
securing the bottom edge of the inverter wiring box (see Figure 2-9).
2. Connect the mounting bracket vertically to the poles or rails (Figure 2-9):
Be sure to use at least two bolts to secure the mounting bracket to the
support.
Position the lower edge of the bracket a minimum of 110 cm (43 inches)
above the floor or ground.
3. If using a single vertical pole, ensure that the inverter is secure and unable to
rotate around the pole.
110 (43)
Ground /
Floor

Figure 2-9 Examples of Mounting on a Pole or Rails

http://www.wholesalesolar.com/inverters.html
Mounting Bracket
At least 2 bolts to
secure bracket to
poles/rails.
For securing
the bottom of
the wiring box
All measurements
in cm (inches).
Ground /
34
(13.5)
48
(18.9)
15
(5.9)
100 (39)
Floor
975-0245-01-01