Startup Procedure; Checking The Pv Array Dc Voltage; Checking The Ac Utility Voltage - Xantrex GT2.5-NA Owner's Manual

Grid tie solar inverter
Table of Contents

Advertisement

Starting the Inverter

Startup Procedure

Checking the PV Array DC Voltage

Checking the AC Utility Voltage

4–2
http://www.wholesalesolar.com/inverters.html
Starting up the GT Inverter requires several steps. You will need to:
1. Ensure the DC/AC Disconnect switch is in the OFF position (see Figure 4-1).
2. Check the PV array DC voltage (see procedure below).
3. Check the AC utility voltage (see procedure below).
4. Replace the cover on the wiring box (see "Replacing the Wiring/Disconnect
Box Cover" on page 4–3).
5. Start up the GT Inverter by switching the DC/AC Disconnect switch ON.
WARNING: Shock hazard
Hazardous voltages are present from two sources. Use extreme caution during startup
procedure. Before applying power to the GT Inverter, ensure all AC and DC wiring is
correct.
To check the PV array DC voltage:
1. Uncover the PV arrays and expose them to full sunlight. The sunlight must be
intense enough to produce the required output voltage.
2. Measure the PV array open circuit DC voltage across the DC positive (+) and
negative (–) terminals. This voltage must be greater than 150 volts DC (to
energize the electronics) and less than 600 volts DC (to prevent damage to the
inverter).
To check the AC utility voltage:
1. Switch on the main and inverter breakers in the main electrical service panel.
2. Using an AC voltmeter, measure the AC open circuit utility voltage between
L1 and L2. Ensure this voltage is at approximately the nominal value. The
inverter operates with a line-to-line voltage (L1 to L2) range around the
nominal value.
See "Electrical Specifications", "Output" on page A–2 for the utility voltage
operating range for your GT Inverter model.
http://www.wholesalesolar.com/inverters.html