Mounting on Wallboard, Siding or Concrete
34 (13.5)
110 (43)
Ground / Floor
Single GT Inverter

Figure 2-10 Installing the Mounting Bracket using Plywood Support

975-0245-01-01
http://www.wholesalesolar.com/inverters.html
To mount the GT Inverter to wallboard, siding, or concrete:
1. Locate the area where the GT Inverter is to be installed.
2. Install backing support material if required. See Figure 2-10.
At least 2 screws
with washers to
secure bracket
to plywood
3. Using a level, place the mounting bracket against the wall surface at least
110 cm (43 inches) from the ground. See Table 2-2 on page 2–18 to ensure
minimum clearance requirements are met.
4. Mark the location for mounting screws if using a wall stud for support. At
least four mounting screws and anchors are needed for concrete installations
or wallboard installations where no wall studs are available for support.
For multiple inverter installations, the brackets should be mounted at least
15 cm (6 inches) apart, or at least 40.6 cm (16 inches) on-center.
5. Remove the bracket and drill the holes using an appropriately sized drill bit.
Drill appropriately sized holes for screws or anchors.
6. Secure the bracket to the supporting surface using at least two screws and
washers.
http://www.wholesalesolar.com/inverters.html
40.6 (16)
O.C.
15
(6)
110 (43)
Ground / Floor
Multiple GT Inverters
Mounting the Inverter
All measurements
in cm (inches).
2–21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt3.0-naGt3.3-na

Table of Contents