Sign In
Upload
Manuals
Brands
Xantrex Manuals
Inverter
PV100S-208
Xantrex PV100S-208 Manuals
Manuals and User Guides for Xantrex PV100S-208. We have
2
Xantrex PV100S-208 manuals available for free PDF download: Operation And Maintenance Manual, Planning And Installation Manual
Xantrex PV100S-208 Operation And Maintenance Manual (124 pages)
100 kW Grid-Tied Photovoltaic Inverter
Brand:
Xantrex
| Category:
Inverter
| Size: 3 MB
Table of Contents
About this Manual
5
Conventions Used
6
Abbreviations and Acronyms
7
Related Information
7
Important Safety Instructions
9
General Safety Precautions
10
Personal Safety
10
Safety Equipment
10
Wiring Requirements
10
Lockout and Tag
12
Operational Safety Procedures
12
De-Energize/Isolation Procedure
13
Interconnection Standards Compliance
13
Table of Contents
15
1 Introduction
23
Operation Features
24
Fixed Unity Power Factor Operation
24
Peak Power Tracking
25
Utility Voltage/Frequency Fault Automatic Reset
26
Figure 1-1 Maximum Peak Power Tracking
26
Safety Features
27
Anti-Island Protection
27
PV Ground Fault Detection
27
DC Over-Voltage Detection
27
Physical Characteristics
28
Figure 1-2 PV100S Major Components
28
Inductor Enclosure
29
Main Inverter Enclosure
29
Power Distribution Panel
29
Converter Control Unit (CCU2)
29
Power Electronics Matrix
29
AC Interface Enclosure
30
DC Interface Enclosure
30
Figure 1-3 DC Interface Enclosure
30
Transformer Enclosure
30
Communications Enclosure
31
Figure 1-4 AC Interface Enclosure and Transformer Enclosure
31
Figure 1-5 PC Connections in the Communications Enclosure
31
Operator Interface Controls
32
Main Enclosure Door Interlock Switch
32
Figure 1-6 PV100S Operator Interface Components
32
On/Off Switch
33
Figure 1-7 On/Off Switch
33
AC and DC Disconnect Switches
34
Communication Features
34
Figure 1-8 AC and DC Disconnect Switches
34
Data Logging
35
System Status and Fault Reporting
35
Communication Methods
36
Universal Front Panel Control Unit (UFCU)
36
Figure 1-9 LCD Display and UFCU Location
36
PC Connection Methods
37
Figure 1-10 PC Connections in the Communications Enclosure
37
Figure 1-11 POTS Access
38
Figure 1-12 Wireless Access
38
POTS Access
38
Wireless Access
38
Direct Access
39
Ethernet LAN Access
39
Figure 1-13 Ethernet LAN Access
39
Figure 1-14 Direct Access
39
GUI Software Features
40
2 Operation
41
Description of System Operation
42
Overview
42
Faults
42
Rev C
43
Figure 2-1 Operating States Flow Chart
43
Operating States
44
Power Tracking
44
Transition
44
Shutdown
45
Fault
45
Manual Current
45
Matrix Test
45
Automatic Sleep Test
45
Operator Interface
46
UFCU Keypad Operation and LCD Display
46
Figure 2-2 the Universal Front Panel Control Unit (UFCU) and LCD
46
LCD Display - Initialization Screen
47
Standard Display
47
Menu Structure
48
Figure 2-4 Operator Interface Menu Diagram
48
Read Menu
49
Table 2-1 Scrolling through the Read Menu Parameters
49
Figure 2-5 Scrolling through the Read Menu
50
Table 2-2 Read Menu Descriptions
51
Figure 2-6 Read-By-ID Feature
53
Table 2-3 Data Logging Menu
54
Table 2-4 Accumulated Values Menu
54
Write Menu
55
Table 2-5 Write Menu Parameters
56
Commanding Goal State Changes
60
Figure 2-7 State Transition Diagram
60
Setting the Date and Time
61
Manual State Transitions
62
Automatic State Transitions
62
Auto-Restart Feature
63
Figure 2-8 LCD Showing Fault Code
63
Energize Procedure (Startup)
64
De-Energize/Isolation Procedure (Shutdown)
64
Computer Communications with the PV100S
65
Figure 2-9 GUI Interface Main Menu Screen
65
Installing the Graphic User Interface (GUI) Software
66
Minimum System Requirements
66
Starting the Software Setup Program
66
Starting the Setup Program Using Autorun
66
Starting Setup Manually
66
Starting Setup from a Command Prompt
67
Figure 2-10 Starting Setup from a Command Prompt
67
Figure 2-11 GUI Splash Screen
68
Figure 2-12 GUI Setup Welcome Window
68
Model Specific Software Installation
68
Figure 2-13 GUI Setup Start Window
69
Figure 2-14 GUI Setup Program Group Window
69
Figure 2-15 GUI Setup Progress Indicator Window
70
Figure 2-16 GUI Setup Start Window
70
Running the GUI
71
Remote/Lan Connection
71
Figure 2-17 GUI Interface Screen if Connected Remotely
71
Direct Connection
72
Figure 2-18 GUI Interface Screen if Connected Directly
72
GUI Configuration - Adding Inverters
73
Figure 2-19 Detail Screen
73
Figure 2-20 Contact Screen
73
Figure 2-21 Operational Configuration Screen - Limits
74
Figure 2-22 Operational Configuration Screen - PV
74
Figure 2-23 Operational Configuration Screen - Power Tracker
75
Figure 2-24 Connection Configuration Screen - General
75
Figure 2-25 Connection Configuration Screen - Telephone Fault Configuration
76
Figure 2-26 Connection Configuration Screen - General
76
Figure 2-27 GUI Help Topics
77
GUI Help
77
3 Commissioning
79
Commissioning Procedure
80
Starting the Commissioning Test File
80
Serial Number
81
Verify AC Voltage
81
Verify DC Voltage
81
Inspect Inductor Enclosure
82
Apply Grid Voltage
82
Front Panel Display
82
Establish Communications with the GUI
83
Confirm AC Operational Parameters
83
Confirm DC Operational Parameters
84
Confirm Power Tracker Configuration Operational Parameters
84
Verify Door Interlock Functions
84
Matrix Test
84
Operate Inverter
85
Completed Commissioning
85
4 Troubleshooting
87
Faults and Fault Codes
88
General Troubleshooting
88
Clearing Faults Manually
89
Figure 4-1 LCD Showing Fault Code
89
Fault Code Descriptions
90
Table 4-1 Fault Codes
90
5 Preventative Maintenance
97
Maintenance Safety
98
Operational Safety Procedures
98
De-Energize/Isolation Procedure
98
Lockout and Tag
99
Figure 5-1 Inverter AC Terminal Locations in the Main Inverter Enclosure
100
Figure 5-2 Utility AC Terminal Connections in the AC Interface Enclosure
100
Figure 5-3 PV Terminal Locations
101
Periodic Maintenance
102
Monthly Intervals or as Required
102
Aluminum Extrusion Heatsink
102
Fan Operation
102
Internal Circulation Fan
102
Inductor Enclosure Cooling Fan
102
Six-Month Intervals
103
Enclosure Seals
103
Electrical Connections
103
Inductor Enclosure
103
Specifications
105
System Specifications
106
Environmental Specifications
106
Table A-1 Environmental Specifications
106
Electrical Specifications
107
Over Voltage, under Voltage and Frequency Ranges
107
Table A-2 Electrical Specifications for the PV100S 100 Kw Grid-Tied Photovoltaic Inverter
107
Table A-3 Over/Under Voltage and Over/Under Frequency Ranges
107
Wire Gauge and Torque Requirements
108
Table A-4 AC Terminal Wire Gauge, Bolt Size, and Torque Values
108
Table A-5 DC Terminal Wire Gauge, Bolt Size, and Torque Values
108
Figure A-1 Electrical Diagram (Sample
109
Figure A-2 PV100S-480 Schematic for Main Power Distribution (152316 E1
110
Figure A-3 PV100S-480 Schematic for Control Power Distribution (152316 E2
111
Figure A-4 PV100S-480 Schematic for Converter Control Unit (152316 E3
112
Figure A-5 PV100S-208 Schematic Main Power Distribution (152376 C1
113
Figure A-6 PV100S-208 Schematic for Control Power Distribution (152376 C2
114
Figure A-7 PV100S-208 Schematic for Converter Control Unit (152376 C3
115
Warranty and Product Information
117
Product Registration
119
Index
121
Advertisement
Xantrex PV100S-208 Planning And Installation Manual (90 pages)
100 kW Grid-Tied Photovoltaic Inverter
Brand:
Xantrex
| Category:
Inverter
| Size: 3 MB
Table of Contents
About this Manual
5
Conventions Used
6
Abbreviations and Acronyms
7
Related Information
7
Important Safety Instructions
9
General Safety Precautions
10
Personal Safety
10
Wiring Requirements
10
Safety Equipment
10
Lockout and Tag
12
Operational Safety Procedures
12
Interconnection Standards Compliance
13
De-Energize/Isolation Procedure
13
Table of Contents
15
Introduction
21
Description of the PV100S
22
Figure 1-1 Dimensions (Not to Scale)
23
System Specifications
24
Electrical Specifications
24
Over Voltage, under Voltage and Frequency Ranges
24
Table 1-1 Electrical Specifications
24
Table 1-2 Over/Under Voltage and Over/Under Frequency Ranges
24
System Ground Requirements
25
System Neutral Requirements
25
Utility Side Isolation Transformer Requirements
25
Environmental Specifications
26
Table 1-3 Environmental Specifications
26
Operator Interface Controls
27
Main Enclosure Door Interlock Switch
27
Figure 1-2 PV100S Operator Interface Components
27
On/Off Switch
28
Figure 1-3 On/Off Switch
28
AC and DC Disconnect Switches
29
Communication Features
29
Figure 1-4 AC and DC Disconnect Switches
29
System Status and Fault Reporting
30
Data Logging
30
Communication Methods
31
Universal Front Panel Control Unit (UFCU)
31
Figure 1-5 LCD Display and UFCU Location
31
PC Connection Methods
32
Figure 1-6 PC Connections in the Communications Enclosure
32
POTS Access
33
Wireless Access
33
Figure 1-7 POTS Access
33
Figure 1-8 Wireless Access
33
Ethernet LAN Access
34
Direct Access
34
Figure 1-9 Ethernet LAN Access
34
Figure 1-10 Direct Access
34
Planning
35
Overview of PV100S Installation
36
PV Planning
37
Ventilation and Serviceability Requirements
37
Ground Requirements
38
System Neutral Requirements
38
Communication Requirements
38
Utility Side Isolation Transformer Requirements
38
Electrical Diagrams and Schematics
39
Figure A-2 PV100S-480 Schematic for Main Power Distribution (152316 E1
39
Figure A-3 PV100S-480 Schematic for Control Power Distribution (152316 E2
39
Figure A-4 PV100S-480 Schematic for Converter Control Unit (152316 E3
39
Figure A-5 PV100S-208 Schematic Main Power Distribution (152376 C1
39
Figure A-6 PV100S-208 Schematic for Control Power Distribution (152376 C2
39
Figure A-7 PV100S-208 Schematic for Converter Control Unit (152376 C3
39
Layout Options
40
Figure 2-1 PV100S Layout Option a
40
Figure 2-2 PV100S Layout Option B
41
Conduit Penetration
42
Figure 2-3 Conduit Entry Figure Reference
42
Figure 2-4 Inductor Enclosure Conduit Entry, Left Side
43
Figure 2-5 Transformer Enclosure Conduit Entry, Right Side
43
Figure 2-6 AC Interface Enclosure Conduit Entry, Left Side
44
Figure 2-7 DC Interface Enclosure, Bottom Side
44
Figure 2-8 Communications Enclosure Conduit Entry, Bottom Side
44
Conductor and Conduit Sizing
45
Anchoring the PV100S
47
152315 Rev C XIII
47
Figure 2-9 Main Inverter Anchor Bolt Pattern (Not to Scale)
47
Figure 2-10 AC Interface/Transformer Anchor Bolt Pattern (Not to Scale)
48
Installation
49
Equipment Required
50
Unloading
50
Moving the PV100S
51
Unpacking the PV100S
51
Figure 3-1 Moving the Crated PV100S
51
Removing the Pallet and Moving the PV100S
52
Figure 3-2 Forklift Lifting Locations - Underneath Unit
52
Mounting and Anchoring the Units
53
Figure 3-3 Mounting Hole Locations
53
Opening or Closing Access Doors
54
Figure 3-4 Inverter Enclosure Access Doors
54
Figure 3-5 AC Interface Access Door
55
Figure 3-6 DC Interface Access Door
55
Figure 3-7 Transformer Access Panels
56
Figure 3-8 Inductor Access Panels
56
Conduit Installation
57
Figure 3-9 Conduit Installation
57
Wiring - General
58
Overcurrent Protection
59
Conductor Termination
59
Wire Gauge and Torque Requirements
60
Grounding
60
Table 3-1 AC Terminal Wire Gauge, Bolt Size, and Torque Values
60
Table 3-2 DC Terminal Wire Gauge, Bolt Size, and Torque Values
60
Figure 3-10 Single-Point Ground (TB2) Ground Bar
60
System Neutral Requirements
61
Utility Side Isolation Transformer Requirements
61
Figure 3-11 Chassis Ground Bar (TB1)
61
Wiring - Specific
62
AC Connections
62
Figure 3-12 Route AC Cables through the Conduit
62
Figure 3-13 Tie-Wraps on the AC Sense Harness
63
Figure 3-14 AC Terminal Connections in the AC Interface/Transformer Enclosure
63
Figure 3-15 AC Terminal Connections in the Main Inverter Enclosure
64
Figure 3-16 AC Terminal Connections in the AC Interface Enclosure
64
Figure 3-17 Connecting the AC Sense Harness
65
Figure 3-18 AC Terminal Connections from the Utility
66
PV Array Connections
67
Figure 3-19 PV Array Cable Routing and Terminations
67
PC Communications
68
PC Connection Methods
68
Establishing a POTS Connection
69
Figure 3-20 Telephone Cable Routing
69
Establishing Wireless Connection
70
Establishing an Ethernet LAN Connection
70
Direct Connection
71
Figure 3-21 RS232/FO Converter Kit Installation
71
Figure 3-22 Direct Connect Installation
72
Verification
73
Verification Procedure Summary
74
Visual Inspection of Mechanical Connections
75
Visual Inspection of Electrical Connections
75
Visual Inspection, Isolation Transformer Wye/Wye
76
Corrective Action
76
A Schematics
77
Figure A-1 Electrical Diagram (Sample
79
Index
87
Advertisement
Related Products
Xantrex PV100S-480
Xantrex PV-100208
Xantrex PV-30208
Xantrex PV-225208
Xantrex PV225S-480-P
Xantrex PV-15208
Xantrex PV-20208
Xantrex PV-45208
Xantrex SW Plus 2524
Xantrex PowerSource Mobile 100
Xantrex Categories
Inverter
Power Supply
Battery Charger
Controller
Power Pack
More Xantrex Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL