Mount Enclosure; Install Cp3 Board; Mount Chassis In Enclosure - Zeta Classic 2000 MKII Installation And Operation Manual

January 2002,part # z6000-0001 man-z3k-01 revision 1.0
Table of Contents

Advertisement

Zeta Alarm Systems.
To reduce the risk of electrical shock, make sure that all power has been turned off or discon-
nected prior to attempting to connect power to the Power Supply Controller.
Apply AC Power BEFORE connecting batteries to the CP3.
Provide the Fire Alarm Control Panel with a dedicated AC Circuit rated 15 Amps
Refer to Figure I-3 for wiring diagram.
1. Attach the black (hot) wire from
the source to terminal "Line" on
the Power Supply Controller
(PSC) board.
2. Attach the white (neutral) wire
from the source to the "Neu-
tral" terminal on the PSC
board.
3. Attach the ground wire from
the source to the "Earth" termi-
nal on the PSC board.
Power up the system prior to con-
necting the batteries and prior to
making any input or NAC connec-
tions. This will insure that the sys-
tem is operating properly prior to
field wiring and assist in trouble
shooting should any problems
arise after field wiring is termi-
nated.
Connect batteries to the system as follows (See Figure I-3):
1. Connect the short black wire (from the assembly hardware kit) from the negative terminal on
Battery 1 to the positive terminal on Battery 2.
2. Connect the red wire from the battery wire harness to the positive terminal on Battery 1.
3. Connect the black wire from the battery wire harness to the negative terminal on Battery 2.
Revision 1.0
Classic 2000 Mk II Operation Manual
WARNING!
Part # MAN-Z3K-01
Figure I-3
Page 20

Advertisement

Table of Contents
loading

Table of Contents