7. Connect the DUT to the test fixture. (Figure 5-3).
Figure 5-3 CBUS Line Capacitance Test Setup
8. Press
Trigger
> Single.
> and enter "1 MHz" for Marker 1. Record the marker value (C
9. Press
Marker
10. Confirm the capacitance (C
5-7.
Table 5-7 CBUS Line Capacitance Limit
CBUS Line Capacitance
*1. Minimum capacitance on CBUS is required to limit rise and fall times when connecting
with minimum load, as from a Source to Dongle with minimum cable length.
= C
- C
CBUS
TOTAL
FIXTURE
Min
30
22
) is within the limit shown in Table
Max
Unit
Note
350
pF
*1
).
TOTAL