Running Test; Function Description; Operations - Toshiba Tecra M5 Maintenance Manual

Maintenance manual
Hide thumbs Also See for Tecra M5:
Table of Contents

Advertisement

3 Tests and Diagnostics
3.23

Running Test

3.23.1 Function Description

This function automatically executes the following tests in sequence:
1. System test (subtest 01)
2. Memory test (subtests 01, 02, 06)
3. Display test (subtest 01)
4. Real timer test (subtest 02)
5. HDD test (subtest 01)
The system automatically detects the number of floppy disk drives connected to the computer
for the FDD test.

3.23.2 Operations

1. Select 6 from the DIAGNOSTIC MENU and press Enter, the following messages
for selectable tests will appear in the display in order.
FDD write/read test (Y/N) ?
Printer wrap around test (Y/N) ?
Serial wrap around test (Y/N) ?
CD-ROM/DVD-ROM test (Y/N) ?
2. To execute the test, press Y and Enter. To cancel the test, press N and Enter. If you
select the selectable tests, follow the instruction message in the display.
3. After selecting the selectable tests, the running test starts automatically. To terminate
the program, press Ctrl + Break.
3-50
[CONFIDENTIAL]
3.23 Running Test
TECRA M5 Maintenance Manual (960-542)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents