Emergency On/Off Switch (Sw2); 4 To 20 Ma Input - Carrier 30XA080-500 Controls, Start-Up, Operation, Service And Troubleshooting Instructions

Air-cooled liquid chillers
Table of Contents

Advertisement

DESCRIPTION
Power (24 vac supply)
Local Equipment
Network
Circuit C Discharge
Pressure Transducer
Circuit C Suction
Pressure Transducer
Circuit C Low Ambient
Temperature
Head Pressure
Control Speed Signal
Fan Contactor C1
Fan Contactor C2
Fan Contactor C3
Fan Contactor C4
Fan Contactor C5
Fan Contactor C6
Fan Contactor C7
Fan Contactor C8
Table 9 -- Fan Board C Inputs and Outputs
(30XA400-500)
INPUWOUTPUT
I/O TYPE
NAVIGATOR MODULE
POINT NAME
CONNECTION POINT
(Unit Size)
Pin
I
Notation
FBC-J1
11
24 vac
12
Ground
FBC-J9
+
G
DPTC
Pressure Transducer
PRE$SURES-_PRC.C-_DP.C
FBC-J7-CH 13
SPTC
Pressure Transducer
PRESSURES_PRC.C_SP.C
0-10 VDC
Contactor
Contactor
Contactor
Contactor
Contactor
Contactor
Contactor
Contactor
MM-C
OUTPUTS-_CIR.
C--_SPD. C
FCC1
FCC2
FCC3
FCC4
FCC5
FCC6
FCC7
FCC8
FBC-J8-CH14
FBC-CH9
FBC-J2-CH1
FBC-J2-CH2
FBC-J2-CH3
FBC-J2-CH4
FBC-J3-CH5
FBC-J3-CH6
FBC-J3-CH7
FBC-J3-CH8
Enable-Off-Remote
Contact
Switch
(SWl)
--
This switch is installed in all units and provides the owner and
service person with a local means of enabling
or disabling
the
machine.
It is a 3-position
switch used to control the chillel:
When switched
to tile Enable position the chiller is under its
own control. Move the switch to the Off position to shut the
chiller down. Move tile switch to tile Remote Contact position
and a field-installed
dry contact can be used to start tile chiller.
The contacts
must be capable
of handling
a 24-vac, 50-mA
load. In the Enable and Remote Contact
(dry contacts closed)
positions, the chiller is allowed to operate and respond to the
scheduling
configuration,
CCN
configuration
and set point
data.
Emergency
On/Off Switch (SW2) -- This
switch is
installed in ;til units. The Emergency On/Off
switch should
only be used when it is required to shut the chiller off immedi-
ately. Power to all modules is interrupted when this switch is
off"and all outputs from these modules will be turned off.
Energy Management
Module
(EMM) -- The EMM
is available as a factory-installed option or as a field-installed
accessory. See Fig. 6. The EMM receives 4 to 20 mA inputs for
the tempemtme
reset,
cooling
set point and demand
limit
functions.
The EMM also receives
tile switch inputs for the
field-installed
second stage 2-step demand
limit and ice done
functions.
The EMM
communicates
the status of all inputs
with the MBB, and the MBB adjusts the control point, capacity
limit, and other functions according
to tile inputs received. See
Table 10.
Care should be taken when interfacing with other manufac-
turer's control systems due to possible power supply differ-
ences,
full wave
bridge
versus
half wave
rectification,
which could lead to equipment
damage. The two diffelent
power supplies cannot be mixed. Crm_fortLink
TM
controls
use half wave rectification.
A signal isolation device should
be utilized if incorporating
a full wave bridge rectifier sig-
nal generating device is used.
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents