START-UP
CHECKLIST
FOR 30XA LIQUID
CHILLERS
A. PROJECT
INFORMATION
Job Nante
Installing Contractor
Ad&'ess
Sales Office
City
State
Zip
Start-up Perfonned
By
Design Information
Cooler
Unit
Model
Compressors
Contpressor
A
Model
Compressor
B
Model
Compressor
C
Model
Cooler
} 0APA0'T
FL0'0T PE
t FLOWOA'E
Serkd
AMBIENT
Serkd
Seri_d
Seri_d
Model
Serkd
B. PRELIMINARY
EQUIPMENT
CHECK
(This section
to be completed
by installing
contractor)
I. Is there any physical datnage?
[]
Yes
[] No
Will this prevent start-up?
[]
Yes
[] No
Description
2. Unit is installed level as pet the installation
instructions.
3. Power supply agrees with the unit nameplate.
4. Correct control voltage
vac.
5. Electric_fl power wiring is installed properly.
6. Unit is properly grounded.
7. Electric_fl circuit protection has been sized and installed properly.
8. All termimds are tight.
9. All plug assemblies
are tight.
10. All cables, thermistors
and ttansducers
have been inspected for cross wires.
11. All thermistot:s are fully inserted into wells.
12. Oil separator heaters energized
for 24 hours befote start-up.
13. Relief valve vent piping per local codes.
Chilled
Water
System
Check
1. All chilled water valves ate open.
2. All piping is connected
properly.
3. All air has been purged from the system.
4. Chilled water pump is operating with the correct rotation.
5. Chilled water pump stmter interlocked wiflt chillet:
6. Chilled water flow switch operatiomfl.
7. Inlet piping to cooler includes a 20 mesh strainer
8. Water loop volume greater than 3 gal/ton for air conditioning
or 6 gal/ton for process cooling and low ambient operation.
9. Proper loop freeze protection
provided to __
°F (°C).
Antifreeze
type
Concentration
%.
(If antifreeze
solution is not utilized on 30XA machines
and the
minimum
outdoor ambient is below 32 F (0 ° C) then items 10 and 11
have to be completed
to provide cooler freeze protection to -20 E
Refer to Installation
Instructions
for proper cooler winterization
procedure.)
10. Outdoor piping wrapped with electric heater tape.
11. Cooler heatet:s inst_flled and opemtion_d.
12. Is file Unit equipped with low ambient head pressure control?
a. If yes, are wind baffles installed'?
Book
_b
[]
Yes
[] No
[]
Yes
[] No
[]
Yes
[] No
[]
Yes
[] No
[]
Yes
[] No
[]
Yes
[] No
[]
Yes
[] No
[]
Yes
[] No
[]
Yes
[] No
[]
Yes
[] No
[]
Yes
[] No
[]
Yes
[] No
[] Yes
[] No
[] Yes
[] No
[] Yes
[] No
[] Yes
[] No
[] Yes
[] No
[] Yes
[] No
[] Yes
[] No
[] Yes
[] No
[] Yes
[] No
[] Yes
[] No
[] Yes
[] No
[] Yes
[] No
[] Yes
[] No
Manufacturer
reserves the right to discontinue, or change at any time, specifications
or designs without notice and without incurring obligations.
5_c
Catalog No, 533-00069
Printed in U.S,A,
Form 30XA-1T
Pg CL-1
12-05
Replaces:
New

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents