IBM 7026-H80 - RS/6000 - 256 MB RAM Service Manual page 173

Service guide
Table of Contents

Advertisement

Table 2. Firmware Checkpoints (continued)
Checkpoint
Description
E440
Validate NVRAM, initialize partitions
as needed
E441
Generate /options node NVRAM
configuration variable properties
E442
Validate NVRAM partitions
E443
Generate NVRAM configuration
variable dictionary words
E500
Configure remote I/O subsystem
Action/
Possible Failing FRU
1. Verify that the system firmware
levels are at the current release
levels. Update as necessary.
2. Replace primary I/O backplane
if problem persists.
See the note on page 139.
1. Verify that the system firmware
levels are at the current release
levels. Update as necessary.
2. Replace primary I/O backplane
if problem persists.
See the note on page 139.
1. Verify that the system firmware
levels are at the current release
levels. Update as necessary.
2. Replace primary I/O backplane
if problem persists.
See the note on page 139.
Suspect a system firmware
problem if problem persists. Verify
that the system firmware is at
current release level. Update
back-level system firmware.
See the note on page 139.
1. Configure I/O subsystem
2. The appearance of this code
indicates that the I/O
subsystem configuration has
started or progressed to the
point where the code can be
displayed.
See the note on page 139.
Chapter 4. Checkpoints
155

Advertisement

Table of Contents
loading

Table of Contents