Attaching the Interface Cables
Observe the port status LED:
Step 12
Figure 3-22 Connecting the Supervisor Engine Uplink Ports
If you are using the LX/LH GBIC with MMF, you need to install a patch cord between the GBIC and the
Note
MMF cable.
Supervisor Engine 32 and Supervisor Engine 720 Uplink Ports
To connect to the supervisor engine uplink ports that use SFPs (Supervisor Engine 720 and Supervisor
Engine 32), follow these steps (see
Caution
We strongly recommend that you do not install or remove the SFP transceiver module with fiber-optic
cables attached to it because of the potential damage to the cables, the cable connector, or the optical
interfaces in the SFP transceiver. Disconnect all cables before removing or installing an SFP transceiver.
Removing and installing an SFP transceiver can shorten its useful life. Do not remove and insert SFP
Caution
transceivers more often than is absolutely necessary.
The SFP transceiver modules are static sensitive devices. Always use an ESD wrist strap or similar
Caution
individual grounding device when handling SFP transceivers or when coming in contact with modules.
Catalyst 6500 Series Switches Installation Guide
3-32
The LED turns green when the GBIC transceiver and the target device have an established link.
The LED turns amber while the GBIC discovers the network topology and searches for loops.
This process takes about 30 seconds, and then the LED turns green.
If the LED is off, the target device might not be turned on, there might be a cable problem, or
there might be a problem with the adapter that is installed in the target device.
Figure
3-23):
Chapter 3
Installing the Switch
OL-5781-04