Cisco WS-X6066-SLB-APC Installation Note
Cisco WS-X6066-SLB-APC Installation Note

Cisco WS-X6066-SLB-APC Installation Note

Catalyst 6500 series switch content switching module
Hide thumbs Also See for WS-X6066-SLB-APC:

Advertisement

Catalyst 6500 Series Switch Content Switching
Module Installation Note
Product Number: WS-X6066-SLB-APC
This publication describes how to install the Content Switching Module (CSM) in the Catalyst 6500
series switches, including the software and hardware requirements.
Contents
This publication contains these sections:
Corporate Headquarters:
Cisco Systems, Inc., 170 West Tasman Drive, San Jose, CA 95134-1706 USA
Copyright © 2004 Cisco Systems, Inc. All rights reserved.
Using the CLI, page 20

Advertisement

Table of Contents
loading

Summary of Contents for Cisco WS-X6066-SLB-APC

  • Page 1: Table Of Contents

    Documentation Feedback, page 25 • • Obtaining Technical Assistance, page 25 Obtaining Additional Publications and Information, page 26 • Corporate Headquarters: Cisco Systems, Inc., 170 West Tasman Drive, San Jose, CA 95134-1706 USA Copyright © 2004 Cisco Systems, Inc. All rights reserved.
  • Page 2: Safety Overview

    Safety Overview Safety Overview IMPORTANT SAFETY INSTRUCTIONS Warning This warning symbol means danger. You are in a situation that could cause bodily injury. Before you work on any equipment, be aware of the hazards involved with electrical circuitry and be familiar with standard practices for preventing accidents.
  • Page 3 Safety Overview Warnung WICHTIGE SICHERHEITSHINWEISE Dieses Warnsymbol bedeutet Gefahr. Sie befinden sich in einer Situation, die zu Verletzungen führen kann. Machen Sie sich vor der Arbeit mit Geräten mit den Gefahren elektrischer Schaltungen und den üblichen Verfahren zur Vorbeugung vor Unfällen vertraut. Suchen Sie mit der am Ende jeder Warnung angegebenen Anweisungsnummer nach der jeweiligen Übersetzung in den übersetzten Sicherheitshinweisen, die zusammen mit diesem Gerät ausgeliefert wurden.
  • Page 4 Safety Overview Varning! VIKTIGA SÄKERHETSANVISNINGAR Denna varningssignal signalerar fara. Du befinner dig i en situation som kan leda till personskada. Innan du utför arbete på någon utrustning måste du vara medveten om farorna med elkretsar och känna till vanliga förfaranden för att förebygga olyckor. Använd det nummer som finns i slutet av varje varning för att hitta dess översättning i de översatta säkerhetsvarningar som medföljer denna anordning.
  • Page 5 Safety Overview Aviso INSTRUÇÕES IMPORTANTES DE SEGURANÇA Este símbolo de aviso significa perigo. Você se encontra em uma situação em que há risco de lesões corporais. Antes de trabalhar com qualquer equipamento, esteja ciente dos riscos que envolvem os circuitos elétricos e familiarize-se com as práticas padrão de prevenção de acidentes. Use o número da declaração fornecido ao final de cada aviso para localizar sua tradução nos avisos de segurança traduzidos que acompanham o dispositivo.
  • Page 6 Safety Overview Catalyst 6500 Series Switch Content Switching Module Installation Note 78-15751-03...
  • Page 7: Front Panel Description

    Front Panel Description Front Panel Description This section describes the physical attributes of the Content Switching Module . Figure 1 shows the CSM front panel. Figure 1 Content Switching Module Front Panel Status RJ-45 (Test) connector The RJ-45 connector is covered by a removable plate. Note Catalyst 6500 Series Switch Content Switching Module Installation Note 78-15751-03...
  • Page 8: Status Led

    Front Panel Description Status LED At startup, the CSM initializes various hardware components and communicates with the supervisor engine. The Status LED indicates the supervisor engine operations and the initialization results. During the normal initialization sequence, the status LED changes from off to red, orange, and green. Note For more information on the supervisor engine LEDs, refer to the Catalyst 6500 Series Switch Module Installation Guide.
  • Page 9: Environmental And System Requirements

    The CSM memory is not configurable. CSM software release 4.1(2) requires Cisco IOS software Release 12.1(8a)EX or higher. However, the features new to CSM release 4.1(2) are available only with Cisco IOS Software Release 12.1(19) E and Catalyst operating system software release 7.6 and higher.
  • Page 10: Power Supply

    Software Compatibility Software release 4.1(2) requires Cisco IOS Release 12.1(8a)EX or higher. However, the features new to CSM release 4.1(2) are only available with Cisco IOS Release 12.1(19) E and Catalyst operating system release 7.6 and subsequent releases. Table 3 Table 4 list the CSM software release compatibility.
  • Page 11: Installing The Csm

    12.1(19)E 12.2(14)SX1 12.2(14)SX1 12.2(17d)SXB 1. Back end encryption requires Cisco IOS software release 12.2(17d)SXB for the Supervisor Engine 2 or 12.2(17d)SXA for Supervisor Enging 720. Table 4 CSM with Cisco IOS and Catalyst Operating System Software Requirements CSM Release Supervisor Engine 1 MSFC1 or MSFC2...
  • Page 12: Required Tools

    Installing the CSM Required Tools These tools are required to install the CSM in the Catalyst 6500 series switches: Flat-blade screwdriver • Phillips-head screwdriver • Wrist strap or other grounding device • Antistatic mat or antistatic foam • Whenever you handle the CSM, always use a wrist strap or other grounding device to prevent electrostatic discharge (ESD).
  • Page 13: Removing The Module

    Installing the CSM Removing the Module This section describes how to remove an existing module from a Catalyst 6500 series switch chassis slot. During this procedure, wear grounding wrist straps to avoid ESD damage to the module. Do not directly Caution touch the backplane with your hand or any metal tool, or you could shock yourself.
  • Page 14: Installing A Module

    Installing the CSM Blank faceplates (filler panels) serve three important functions: they prevent exposure to hazardous Warning voltages and currents inside the chassis; they contain electromagnetic interference (EMI) that might disrupt other equipment; and they direct the flow of cooling air through the chassis. Do not operate the system unless all cards and faceplates are in place.
  • Page 15 Installing the CSM Figure 2 Positioning the Module in a Horizontal Slot Chassis Insert module between slot guides EMI gasket WS-X6K-SUP2-2 GE Switch Load 100% CONSOLE PORT PORT 1 MODE PORT 2 CONSOLE SUPERVISOR2 PCMCIA EJECT WS-X6K-SUP2-2 GE Switch Load 100% CONSOLE PORT...
  • Page 16 Installing the CSM Figure 3 Clearing the EMI Gasket in a Horizontal Slot Chassis WS-X6K-SU P2-2GE Switch Load 100% CONSOLE PORT 1 PORT PORT 2 MODE CONSOLE SUPERVIS OR2 PCMCIA EJECT WS-X6K-SU P2-2GE Switch Load 100% CONSOLE PORT 1 PORT PORT 2 MODE CONSOLE...
  • Page 17 Installing the CSM Figure 4 Ejector Lever Closure in a Horizontal Slot Chassis WS-X6K-SU P2-2GE Switch Load 100% CONSOLE PORT 1 PORT PORT 2 MODE CONSOLE SUPERVIS OR2 PCMCIA EJECT WS-X6K-SU P2-2GE Switch Load 100% CONSOLE PORT PORT 1 PORT 2 MODE CONSOLE SUPERVIS OR2...
  • Page 18 Installing the CSM Figure 5 Positioning the Module in a Vertical Slot Chassis Ejector lever fully extended STATUS gasket gasket INPUT OUTPUT FAIL INPUT OUTPUT FAIL Insert module between slot guides Carefully slide the supervisor engine or module into the slot until the EMI gasket along the right edge of the module makes contact with the module in the slot adjacent to it and both ejector levers have closed to approximately 45 degrees with respect to the module faceplate.
  • Page 19 Installing the CSM Figure 6 Clearing the EMI Gasket in a Vertical Slot Chassis Gap between the module EMI gasket and the module above it 1 mm STATUS Press left Press left INPUT OUTPUT FAIL INPUT OUTPUT FAIL Exerting too much pressure on the ejector levers will bend and damage them. Caution While pressing on the ejector levers, simultaneously close them to fully seat the supervisor engine or module in the backplane connector.
  • Page 20: Verifying The Installation

    Using the CLI The software interface for the module is the Cisco IOS and the Catalyst operating system command-line interface accessed through a Telnet connection to the switch or through the switch console interface. Refer to the Catalyst 6500 Series Switch Cisco IOS Software Configuration Guide and the Catalyst 6500 Series Switch Software Configuration Guide for details.
  • Page 21: Related Documentation

    Related Documentation To understand the Cisco IOS command-line interface and Cisco IOS command modes, refer to Chapter 2, “Command-Line Interfaces,” in the Catalyst 6500 Series Switch Cisco IOS Software Configuration Guide. To understand the Catalyst operating system command-line interface and Catalyst operating system command modes, refer to Chapter 2, “Command-Line Interfaces,”...
  • Page 22 Translated Safety Warnings Advarsel Usynlig laserstråling. Radiação laser invisível presente. Aviso ¡Advertencia! Existe radiación láser invisible. Varning! Nu pågående osynlig laserstrålning. Blank faceplates and cover panels serve three important functions: they prevent exposure to Warning hazardous voltages and currents inside the chassis; they contain electromagnetic interference (EMI) that might disrupt other equipment;...
  • Page 23 Translated Safety Warnings Warnung Blanke Faceplates und Abdeckungen haben drei wichtigen Funktionen: (1) Sie schützen vor gefährlichen Spannungen und Strom innerhalb des Chassis; (2) sie halten elektromagnetische Interferenzen (EMI) zurück, die andere Geräte stören könnten; (3) sie lenken den kühlenden Luftstrom durch das Chassis.
  • Page 24: Obtaining Documentation

    Obtaining Documentation Obtaining Documentation Cisco documentation and additional literature are available on Cisco.com. Cisco also provides several ways to obtain technical assistance and other technical resources. These sections explain how to obtain technical information from Cisco Systems. Cisco.com You can access the most current Cisco documentation at this URL: http://www.cisco.com/univercd/home/home.htm...
  • Page 25: Documentation Feedback

    URL: http://www.cisco.com/techsupport/servicerequest For S1 or S2 service requests or if you do not have Internet access, contact the Cisco TAC by telephone. (S1 or S2 service requests are those in which your production network is down or severely degraded.) Cisco TAC engineers are assigned immediately to S1 and S2 service requests to help keep your business operations running smoothly.
  • Page 26: Obtaining Additional Publications And Information

    Definitions of Service Request Severity To ensure that all service requests are reported in a standard format, Cisco has established severity definitions. Severity 1 (S1)—Your network is “down,” or there is a critical impact to your business operations. You and Cisco will commit all necessary resources around the clock to resolve the situation.
  • Page 27 Obtaining Additional Publications and Information iQ Magazine is the quarterly publication from Cisco Systems designed to help growing companies • learn how they can use technology to increase revenue, streamline their business, and expand services. The publication identifies the challenges facing these companies and the technologies to help solve them, using real-world case studies and business strategies to help readers make sound technology investment decisions.
  • Page 28 Obtaining Additional Publications and Information This document is to be used in conjunction with the documents listed in the “Related Documentation” section. Copyright © 2004 Cisco Systems, Inc. All rights reserved. Catalyst 6500 Series Switch Content Switching Module Installation Note 78-15751-03...

This manual is also suitable for:

Catalyst 6500 seriesCatalyst 6500 ws-x6066-slb-apc

Table of Contents