Chapter 2
Preparing for Installation
Table 2-4
Site Planning Checklist (continued)
Task No.
Planning Activity
5
Cable and interface equipment evaluation:
Cable type
•
•
Connector type
•
Cable distance limitations
Interface equipment (transceivers)
•
6
EMI evaluation:
Distance limitations for signaling
•
Site wiring
•
RFI levels
•
1. Verify that each power supply installed in the chassis has a dedicated AC source or DC source circuit.
OL-5781-04
Verified By Time
Catalyst 6500 Series Switches Installation Guide
Site Preparation Checklist
Date
2-23