Installing The L Brackets And Cable Guides On The Catalyst 6509-Neb Switch - Cisco 6509 - Catalyst Chassis Switch Installation Manual

Installation guide
Table of Contents

Advertisement

Chapter 3
Installing the Switch
Figure 3-6
L-bracket
12 x 24
or
10 x 32
(10x)

Installing the L Brackets and Cable Guides on the Catalyst 6509-NEB Switch

The Catalyst 6509-NEB switch chassis is normally shipped with the L brackets installed. If the chassis
Note
does not have the L brackets installed, follow the steps in this section to install the L brackets on your
Catalyst 6509-NEB switch chassis.
The Catalyst 6509-NEB L bracket screw holes are stamped + and –. You can install the brackets on either
the left or right side of the chassis; use the + holes on one side and the – holes on the other side. The
L brackets are installed with ten M4 Phillips countersunk-head screws (five screws on each side).
OL-5781-04
Attaching L Brackets and Cable Guides: Catalyst 6509 Switch and Catalyst 6509-E Switch
WS-X6K-SUP2-2 GE
1
SUPERVISOR2
WS-X6K-SUP2-2 GE
2
SUPERVISOR2
WS-X6408
3
8 PORT GIGABIT ETHERNET
WS-X6408
4
8 PORT GIGABIT ETHERNET
WS-X6408
5
8 PORT GIGABIT ETHERNET
6
1
1
7
1
8
FAN
STATU S
1
9
o
Cable guide
Switch
Load
100%
CONSOLE
PORT
PORT 1
MODE
CONSOLE
PCMCIA
EJECT
1%
Switch
Load
100%
CONSOLE
PORT
PORT 1
MODE
CONSOLE
PCMCIA
EJECT
1%
1
2
3
4
5
6
1
2
3
4
5
6
1
2
3
4
5
6
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
o
INPUT
FAN
OUTPU T
OK
OK
FAIL
Catalyst 6500 Series Switches Installation Guide
Installing the Rack-Mount Kit
PORT 2
PORT 2
7
8
7
8
7
8
20
21
22
23
24
20
21
22
23
24
20
21
22
23
24
20
21
22
23
24
INPUT
FAN
OUTPU T
OK
OK
FAIL
3-11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ws-c6506Catalyst 6500 series

Table of Contents