Hourly interval equivalents
Typical hourly interval equivalents are shown below. A value of 999 hours is the maximum that can
be entered.
24 hrs
every day
48 hrs
every other day
168 hrs
every week
336 hrs
every other week
720 hrs
every 30 days
728 hrs
every month (average)
999 hrs
every 41.63 days, 5.95 weeks, 1.40 months
Removing scheduled job events
Remove a scheduled job event from the scheduler.
Procedure
1.
In the navigation pane, select Jobs to display the Jobs window in the content pane.
2.
Click the Schedule tab. The Schedule tab shows the list of scheduled job events.
3.
Select the scheduled job event to remove.
4.
Select Actions > Remove. The Confirm Action window opens.
5.
Click OK. The scheduled event is removed from the list.
Viewing scheduled job events
A scheduled job event can be enabled or disabled. When enabled, the job is automatically run at
the scheduled interval and start time.
When disabled, the job event remains in the list of scheduled events but is not automatically run.
Procedure
1.
In the navigation pane, select Jobs to display the Jobs window in the content pane.
2.
Click the Schedule tab. The Schedule tab shows the list of scheduled job events.
3.
Select the scheduled job event.
4.
Select Actions > View Properties. The Job Schedule Properties window opens and displays
the scheduled job event description.
5.
Click OK to close the window.
Validating jobs
Validate a job to check resource availability before the job begins executing. See jobs validation.
Considerations
•
You can use the GUI or CLUI. See
Hourly interval equivalents
job actions cross
reference.
HP StorageWorks Replication Solutions Manager 4.0.1
181
Need help?
Do you have a question about the 418800-B21 - StorageWorks Modular Smart Array 70 Storage Enclosure and is the answer not in the manual?
Questions and answers