Scheduling Job Events; Creating Scheduled Job Events; Editing Scheduled Job Events; Enabling And Disabling Scheduled Job Events - HP 418800-B21 - StorageWorks Modular Smart Array 70 Storage Enclosure User Manual

Hp storageworks replication solutions manager 4.0.1 user guide (t3680-96308, june 2008)
Hide thumbs Also See for 418800-B21 - StorageWorks Modular Smart Array 70 Storage Enclosure:
Table of Contents

Advertisement

2.
Select an appropriate resource type (if appropriate) and click OK. A list of available resources
appears. In some cases, you can filter the list or narrow the choices.
3.
Select a resource (or several if appropriate) to include in the argument and click OK. The selected
resources are added to the command argument and the Argument Editor window closes.
4.
In the Editing Task window, select another argument, or click OK to close the window.
IMPORTANT:
Selected values appear in the job editor but are not saved until the job is saved.

Scheduling job events

Creating scheduled job events

You can create a scheduled job event that runs a job at a specified interval (frequency) and start time.
You can create multiple scheduled job events for a single job. For example, create a scheduled job
event to run a job every day at 5:00 PM and create another event to run the job once a week (every
7 days) at 12:00AM.
See also
Editing scheduled job
Procedure
1.
In the navigation pane, select Jobs to display the Jobs window in the content pane.
2.
Click the Schedule tab. The Schedule tab shows the list of scheduled job events.
3.
Select Actions > Schedule Job. The Schedule a Job wizard opens, displaying the Select a Job
page. Follow the instructions in the wizard.

Editing scheduled job events

You can edit a scheduled job event to change the start time and run interval (frequency). You can also
update the saved logon credentials. See also
Considerations
You cannot save a scheduled job event without entering security credentials. See
security credentials for the
Procedure
1.
In the navigation pane, select Jobs to display the Jobs window in the content pane.
2.
Click the Schedule tab. The Schedule tab shows the list of scheduled job events.
3.
Select the scheduled job event to edit.
4.
Select Actions > Edit Schedule. The Edit Job Schedule window opens.
5.
On the Credentials tab, enter the logon credentials that are required for the job to access the
replication manager server.
6.
On the Interval tab, you can change the start time and interval
(frequency). See
Scheduled job event run times are wrong
7.
Click OK. The scheduled event is updated.

Enabling and disabling scheduled job events

events.
creating scheduled job
server.
choosing a run
interval. See also troubleshooting,
(AM/PM).
HP StorageWorks Replication Solutions Manager 4.0.1
events.
179

Advertisement

Table of Contents
loading

Table of Contents