Figure E-26
You access this dialog box by using the following methods:
As part of the process of creating a Directive bundle by using the Actions bundle category. For
more information, see
In ZENworks Control Center, click the Bundles tab, click the underlined link of a bundle in the
Name column of the Bundles list, click the Actions tab, click one of the action set tabs (Install,
Launch, Verify, Uninstall, Terminate, or Preboot), click the Add drop-down list, then select an
available action.
NOTE: The Reboot action should not normally be used in conjunction with a Recurring launch
schedule set to When a device is refreshed. Although there are some valid use scenarios for this
configuration, scheduling a device to reboot upon refresh can cause a continuous loop.
Reboot: Reboot the device when this action is performed.
Shutdown: Shut down the device when this action is performed.
Time to Wait Before Reboot/Shutdown: Specify the number of seconds (between -1 and 1800)
before the device reboots or shuts down. When the number of seconds specified passes, the device
reboots or shuts down, regardless of whether the user clicks OK or not. Clicking OK does not cause
the device to immediately reboot or shut down.
A value of -1 causes the device to wait an indefinite period of time, essentially preventing the device
from rebooting or shutting down. You should use a value of -1 in conjunction with the Display a
warning message before doing Reboot/Shutdown and, optionally, the Allow user to cancel options. If
you specify -1 and select the Display a warning message before doing Reboot/Shutdown option, a
158 ZENworks 10 Configuration Management Software Distribution Reference
Action - Reboot/Shutdown Dialog Box
Section 2.1, "Creating Directive Bundles," on page
19.
Need help?
Do you have a question about the ZENWORKS 10 CONFIGURATION MANAGEMENT SP3 - SOFTWARE DISTRIBUTION REFERENCE 10.3 30-03-2010 and is the answer not in the manual?