Step 1:
Select a position on the chassis for the ARM-4:
auxiliary relays for both modules are desired, two ARM-
4s, mounted in separate positions, will be needed.
NOTE: For ease of installation and service, mount the
ARM-4 in a dedicated position on the chassis (if avail-
able) with no module or expander board above it.
Step 3:
Position the ARM-4 over the standoffs on the
chassis and fasten with two remaining screws.
Figure 3-4: Mounting the ARM-4 Auxiliary Relay Module
26
The module can be driven
by either a CRM-4 or a
CRE-4. It can be placed
against the chassis in any
one of eight positions rela-
tive to the CRM-4 or CRE-
4 as illustrated at left. The
ARM can also be installed
directly underneath the
CRM-4 or CRE-4. One
ARM-4 can support one
CRM-4 OR one CRE-4. If
Step 4:
Complete the installation of the ARM-4:
Connect one end of the ARM Ribbon Cable to Plug
P1 on the ARM-4. Connect the other end of the
cable to Jumper JP5 on the CRM-4 or CRE-4
employed to drive the ARM-4.
S5000 15583 Rev.
6/10/96 P/N 15583:
Step 2:
Secure the two loose standoffs to the
screw mounts on the chassis at the
desired location for the ARM-4. En-
sure that the existing standoffs are
installed in the locations illustrated in
STEP 4.