Download Print this page

Removing The Control Box; Figure 75: Moving The Control Box (1/2) - Techman Robot TM25S Series Hardware Installation Manual

Advertisement

Robot Arm Installation, and follow the instructions below to install the robot.
WARNING:
At the installation site, at least two people should simultaneously perform installation of the
robot; otherwise you risk robot arm damage or personal injury. Do not install the robot alone.
WARNING:
Do not attempt to move any robot links until the robot has been secured in position. Failure to
comply could result in the robot falling and causing either personnel injury or equipment
damage.

6.4.1 Removing the Control Box

After checking the contents, remove the contents in order and perform installation.
Control box carton:
Remove the TM Landmark
Remove the power cable of the control box
Remove the control box (At least two people should remove the control box from the carton.
Refer to the figure below for the correct holding positions.)
Connect the power cable to the control box
Place the control box near the robot base
Mount the control box in any direction (as long as the box is securely mounted), with a spacing
of at least 50 cm for the vents on both sides to facilitate cooling
The control box should be carried by at least two people. One should hold on to the handles of the
control box, while the other should carry the foot stands. Before handling, the cable of the robot stick
should not be pulled to avoid any performance degradation.
Hardware Installation Manual: TM25S/TM30S series Hardware version: 5.02
TECHMAN ROBOT INC.
5F., No. 58-2, Huaya 2nd Rd., Guishan Dist., Taoyuan City, 333411 , Taiwan

Figure 75: Moving the Control Box (1/2)

Document version: 1.00
82

Advertisement

loading
Need help?

Need help?

Do you have a question about the TM25S Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Tm25s-mTm30s-mTm25s-xTm30s-x