Executing A Test Switch - AMX Optima AVS-OP-1616-110 Instruction Manual

Distribution matrix
Hide thumbs Also See for Optima AVS-OP-1616-110:
Table of Contents

Advertisement

Executing a Test Switch

Execute a test switch to verify the system is working properly before attaching all inputs and outputs.
Aside from having signal cables attached, the system is ready to execute switches when it ships from the
factory.
The first two source and destination devices must be attached to the input and output connectors as
indicated in the "AutoPatch Optima Connector Guide" that is shipped with each system (for specific
board connector information and specifications, see the specific board chapter in this manual). After the
devices are connected, power must be applied to the enclosure and then to the devices before executing a
test switch.
Note: If the signal from the source or destination device is a component signal that requires being
attached to multiple input or output connectors (e.g., an RGsB signal that requires three
connectors), all of the signal cables for that signal must be attached before executing the test switch.
A test switch can be executed from the following:
Executing a Test Switch
Before executing the test switch, make sure the first two source devices and the first two destination
devices are connected to the input and output connectors exactly as shown on the "AutoPatch Optima
Connector Guide" that is shipped with each system. Depending on the signal type (e.g., component
signals), you may need to attach multiple input and output cables.
Note: Since each board in an Optima has its own switching matrix, signals can only be routed from
inputs on one board to outputs on the same board.
When executing a test switch, we suggest routing Input (source) 1 to Output (destination) 2 on the
virtual matrix or level indicated on the "AutoPatch Optima Connector Guide."
Control Panel
Directions for executing switches using the control panel specific to your system can be found in the
applicable Control Panel Instruction Manual on the AMX AutoPatch CD or at www.amx.com.
Depending on the control panel, the term virtual matrix or level may appear on the LCD screen. When
controlling an Optima, these terms are interchangeable.
®
NetLinx
For executing and disconnecting switches using a NetLinx
representative.
APControl 3.0 or APWeb
Directions for executing and disconnecting switches using APControl 3.0 are found in its Help file. For
directions for executing switches using APWeb, see the APWeb documentation.
Optima Instruction Manual
A front or remote control panel
®
NetLinx
compatible controller
Control software, such as, APControl 3.0 or APWeb
BCS (Basic Control Structure) commands over an external controller
An external third-party controller
Compatible
Installation & Setup
®
compatible controller, contact your AMX
37

Advertisement

Table of Contents
loading

Table of Contents