Omron CX-INTEGRATOR - V1.1 Operation Manual page 196

Table of Contents

Advertisement

4-4-4
Transferring Automatic Data Link Setup Parameters to the Startup Node
• The data link mode (manual/automatic) and data link operation are determined by
Note
the data link setup at the startup node. With automatic setup, it is necessary to set,
for the startup node, the data link mode (automatic) and the number of data link
words in the Automatic Datalink Setup Dialog Box. If these are not set correctly, the
data links will not start.
• Before starting the data links with automatic setup, make sure that the correct
automatic data link setup parameters are set for the data link startup node. If
incorrect automatic data link setup parameters are set, it may cause the equipment
to operate unpredictably. Even when the correct parameters are set, make sure that
there will be no adverse effect on the equipment before starting or stopping the data
links.
Reading Data from the Startup Node
Perform this operation to check or change settings.
1 Click the Read Button in either the Automatic Datalink (Controller Link) or the
Automatic Datalink Setup Dialog Box.
The following dialog box will be displayed for confirmation.
2 Click the Yes Button.
The set data will be transferred from the PLC and displayed at the Automatic
Datalink (Controller Link) or the Automatic Datalink Setup Dialog Box.
4-4
Automatically Set Data Links
4-49

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx-integrator 1.1Sysmac cxone-al**c-e

Table of Contents