Connection Examples; Central Connection With 24V Signals (Central Operation); Central Operation Without Line Break Monitoring; Figure 11: Wiring Of The Winsta Sunblind Boxes For Conventional 24 V Control - WAGO WINSTA 770 Manual
Pos : 53 /All e Seri en (Allgemei ne Module)/Ü berschriften für alle Serien/Ansc hließ enAnsc hlussbeis piel e - Ü bersc hrift 2 @ 4\mod_1240996036328_21.doc x @ 32010 @ 2 @ 1
6.1
Connection Examples
Pos : 54 /Serie 770 ( WINSTA-Boxen) /Ansc hließ en/Ansc hlussbeis piel e/Ansc hl uss beis piel e 0770-0629/0130-0000 @ 6\mod_1260444240884_21.doc x @ 46973 @ 3443 @ 1
6.1.1
Central Connection with 24V Signals (Central Operation)
6.1.1.1
Central Operation without Line Break Monitoring
On principle, the configuration of a central operation (e.g. central switch, timer)
should take place according to the following scheme.
Figure 11: Wiring of the Winsta sunblind boxes for conventional 24 V control
In central operation without line break monitoring, 24V levels are evaluated as a
control signal.
Heed the line dimensioning!
For the wiring of a system with central control, make sure that the dimensioning
(length and cross-section) of the control line is made according to the boxes
connected.
Setting of the DIP Switches
Switch 4 of DIP Module 2 must be de-activated for operation without line break
monitoring.
Manual
Version 1.2.0, valid from HW/FW version XXXX0201XX