Drilling Plan - Mitel SMB Controller System Manual

Mivoice office 400
Hide thumbs Also See for SMB Controller:
Table of Contents

Advertisement

F
ITTING THE COMMUNICATION SERVER
C
4
I
HAPTER
NSTALLATION
Figure 4.3:
Minimum distances for wall mounting (front panel facing downwards)
All dimensions in mm

Drilling plan

The communication server is suspended into two pre-mounted wall screws using the suspension points
in the housing base. Depending on the type of mounting, these are the suspension points marked under
position A or B on the drilling plan. The communication server is secured with a third screw to prevent it
from being dislodged accidentally (position C).
93

Advertisement

Table of Contents
loading

Table of Contents