Terminal Assignment For Cable Gland - Process Controller Type 8793; Terminal Assignments Of The Process Actual Value Input - Burkert 8792 Operating Instructions Manual

Electropneumatic positioner and process controller
Table of Contents

Advertisement

15.3
Terminal assignment for cable gland - process
controller Type 8793
First connect the process controller as described in chapter "15.2 Terminal assignment for cable gland -
positioner Type 8792"
15.3.1

Terminal assignments of the process actual value input

Input type*
Terminal Configuration
4 – 20 mA
- internally
supplied
GND
4 – 20 mA
- externally
supplied
Frequency
- internally
supplied
GND
Frequency
- externally
supplied
Pt 100
(see infor-
mation
below)
* Can be adjusted via software (see chapter "21 Start-up").
Table 22: Terminal assignments of the process actual value input
Connect the Pt 100 sensor via 3 cables for cable compensation reasons.
It is essential to bridge terminal 3 and terminal 4 on the sensor.
When the operating voltage is applied, the process controller is operating.
Now make the required basic settings and actuate the automatic adjustment of the process controller.
The procedure is described in chapter "21 Start-up".
60
1
+24 V transmitter input
2
Output from transmitter
3
Bridge to GND (Terminal GND
from operating voltage)
4
not used
GND from operating voltage
1
not used
2
Process actual +
3
Process actual –
4
not used
1
+24 V sensor supply
2
Clock input +
3
not used
4
Clock input –
GND from operating voltage
1
not used
2
Clock input +
3
not used
4
Clock input –
1
not used
2
Process actual 1 (Power supply)
3
Process actual 3 (GND)
4
Process actual 2
(Compensation)
english
Type 8792, 8793
Type 8792, 8793
Electrical connection - cable gland
On the device side
External circuit
1
2
Transmitter
GND
3
GND
2
+ (4 – 20 mA)
3
GND 4 – 20 mA
1
+24 V
2
Clock +
4
GND
Clock – (GND)
2
Clock +
4
Clock –
2
3
4
Pt 100

Advertisement

Table of Contents
loading

This manual is also suitable for:

8793

Table of Contents